RFP/RFQ

 

Current Opportunities:

8R9 Parking Structure

The Capitol Area Development Authority (CADA) invites general contractors to submit proposals for design-assist services to build an 800 car parking structure and associated retail space on the block bounded by R Street, Quill Alley, and 8th and 9th Streets in the City of Sacramento.  The site is owned by the State of California and leased to CADA for this purpose.  CADA has contracted with International Parking Design (IPD) for Architectural Services and IPD has completed schematic designs for the project.

 

The purpose for this Request is to select a General Contractor for Progressive Design Build Services for this project.    The selected General Contractor will be assigned the IPD design contract (and any other design contracts for the project into which CADA may have entered).

 

Interested parties that choose to download the RFP using the link below must provide their contact information.  Only those who provide their contact information will receive updates, addendums, and additional communications regarding the RFP.  The RFP contains a detailed description of the development program, eligibility, selection process, and submission requirements.

A pre-submission meeting will be held on March 26, 2020, 3:00 PM at the CADA Administrative Office located at 1522 14th Street, Sacramento, CA 95814.  CADA strongly recommends that interested Applicants attend this pre-submission meeting.  Those planning on attending the meeting, please RSVP to Todd Leon at tleon@cadanet.org

 

UPDATE:  RFP Addendum #1 – Here.

 

 

All proposals are due in hand no later than 3:00 p.m. on Friday, April 10, 2020 

Detailed instructions are provided in the RFP.

 

ALL communications/questions regarding the 8R9 Parking Structure RFP process and project must be sent via E-MAIL to:

Dave Nystrom – McCuen Project Services

Email:  dnystrom@cadanet.org

Click here to download the 8R9 Parking Structure RFP and register for future updates

Attachments to RFP

Attachment 2A – Schematic Drawings Part A

Attachment 2B – Schematic Drawings Part B

Attachment 2C – Outline Specs

Attachment 3 – Draft GC Contract

Attachment 4 – Architect Contract